Skip to content

Latest commit

 

History

History
11 lines (9 loc) · 806 Bytes

RELEASE-CHECKLIST.md

File metadata and controls

11 lines (9 loc) · 806 Bytes

Release checklist

  • Before release, doublecheck that all issues planned for the current release are either closed or postponed to next milestone (New milestone may need to be eventually created).
  • Release can be done by trigger GH workflow (Permissions required)
  • After release, it can be good to close the corresponding milestone (permissions required)
  • GH workflow needs to be executed in keycloak-quickstarts to update keycloak-client version (TBD as workflow not available yet)
  • GH workflow needs to be executed in keycloak-web to update keycloak-client version and send the blog (TBD as workflow not available yet)