Skip to content

ci: split docker install integration tests #1268

ci: split docker install integration tests

ci: split docker install integration tests #1268

Triggered via pull request November 25, 2024 11:22
Status Cancelled
Total duration 1m 18s
Artifacts 2

validate.yml

on: pull_request
prepare
5s
prepare
Matrix: validate
Fit to window
Zoom out
Zoom in

Annotations

3 errors
validate (lint)
Canceling since a higher priority waiting request for 'validate-refs/pull/496/merge' exists
validate (lint)
The operation was canceled.
validate (vendor-validate)
Canceling since a higher priority waiting request for 'validate-refs/pull/496/merge' exists

Artifacts

Produced during runtime
Name Size
docker~actions-toolkit~FBYKY2.dockerbuild
20.7 KB
docker~actions-toolkit~HNS16E.dockerbuild
26.7 KB