Skip to content

PR Test

PR Test #3135

Manually triggered December 19, 2024 05:51
Status Cancelled
Total duration 18m 21s
Artifacts

pr-test.yml

on: workflow_dispatch
Matrix: unit-test-backend-1-gpu
unit-test-frontend
4m 28s
unit-test-frontend
unit-test-backend-2-gpu
5m 27s
unit-test-backend-2-gpu
performance-test-1-gpu-part-1
5m 56s
performance-test-1-gpu-part-1
performance-test-1-gpu-part-2
3m 41s
performance-test-1-gpu-part-2
performance-test-2-gpu
8m 39s
performance-test-2-gpu
accuracy-test-1-gpu
17m 31s
accuracy-test-1-gpu
accuracy-test-2-gpu
11m 13s
accuracy-test-2-gpu
Fit to window
Zoom out
Zoom in

Annotations

16 errors
unit-test-backend-1-gpu (0-6)
Process completed with exit code 1.
unit-test-backend-1-gpu (6-15)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (6-15)
The operation was canceled.
unit-test-backend-1-gpu (30-100)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (30-100)
The operation was canceled.
unit-test-backend-1-gpu (15-23)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (15-23)
The operation was canceled.
unit-test-backend-1-gpu (23-30)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (23-30)
The operation was canceled.
performance-test-1-gpu-part-2
Process completed with exit code 1.
performance-test-1-gpu-part-1
Process completed with exit code 1.
performance-test-2-gpu
Process completed with exit code 1.
unit-test-backend-2-gpu
Process completed with exit code 1.
accuracy-test-2-gpu
Process completed with exit code 1.
accuracy-test-1-gpu
The run was canceled by @zhyncs.
accuracy-test-1-gpu
The operation was canceled.