Skip to content

Fix a cluster client interface for CAS operations to be more compatib… #144

Fix a cluster client interface for CAS operations to be more compatib…

Fix a cluster client interface for CAS operations to be more compatib… #144

Triggered via push April 28, 2024 00:53
Status Failure
Total duration 15m 24s
Artifacts

test.yaml

on: push
Matrix: Driver
Matrix: Redis
Matrix: Ruby
Matrix: TruffleRuby
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Rubocop
Process completed with exit code 1.
Ruby (jruby-9.3.6.0)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 15 minutes.
Ruby (jruby-9.3.6.0)
The operation was canceled.
TruffleRuby (redis)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 15 minutes.
TruffleRuby (redis)
The operation was canceled.