Skip to content

Upgrade to CLDR v46, Unicode v16 #50

Upgrade to CLDR v46, Unicode v16

Upgrade to CLDR v46, Unicode v16 #50

Triggered via push January 18, 2025 22:54
Status Failure
Total duration 1m 34s
Artifacts

unit_tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

19 errors and 1 warning
build (2.3)
Process completed with exit code 1.
build (2.4)
The job was canceled because "_2_3" failed.
build (2.4)
Process completed with exit code 1.
build (3.2)
The job was canceled because "_2_3" failed.
build (3.2)
The operation was canceled.
build (3.1)
The job was canceled because "_2_3" failed.
build (3.1)
The operation was canceled.
build (3.4)
The job was canceled because "_2_3" failed.
build (3.4)
The operation was canceled.
build (2.5)
The job was canceled because "_2_3" failed.
build (2.5)
The operation was canceled.
build (3)
The job was canceled because "_2_3" failed.
build (3)
The operation was canceled.
build (2.6)
The job was canceled because "_2_3" failed.
build (2.6)
The operation was canceled.
build (3.3)
The job was canceled because "_2_3" failed.
build (3.3)
The operation was canceled.
build (2.7)
The job was canceled because "_2_3" failed.
build (2.7)
The operation was canceled.
build (2.3)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636